01

Define the unit and production process

Describe the insulating glass unit, spacer system and filling process. This gives the supplier useful context for discussing a suitable drying material and the supporting components.

02

Make the supporting-material list

List any required spacers, sealants, accessories and production consumables alongside the molecular sieve. Confirm each item separately against your process specification.

03

Discuss compatibility and evaluation

Provide the specifications of materials already in use. Confirm compatibility, the available technical information and an evaluation plan with the supplier before changing materials in production.

This guide helps structure an inquiry. Product suitability and specific technical requirements must be confirmed for the intended use.

Back to resources